UAE building Gulf’s first waste-to-power plant for electricity

Published: Updated:
Enable Read mode
100% Font Size

With rubbish piling up, the United Arab Emirates has found a new way to get rid of its trash – incinerators that will turn it into electricity.

The UAE, one of the world’s top oil exporters, is building the Gulf region’s first waste-to-power plants to ease its chronic trash problem and, at the same time, its reliance on gas-fueled electricity stations.

Advertisement

For all the latest headlines follow our Google News channel online or via the app.

Engineer Nouf Wazir, from waste management company Bee’ah, said the power plant is a way to make use of refuse that cannot be recycled.

“Not everyone knows that waste has value,” said Wazir, a senior engineer on the project.

The Sharjah facility is expected to launch this year, burning more than 300,000 tons of waste per year to power up to 28,000 homes. In the neighboring emirate of Dubai, another plant is being developed at a cost of $1.2 billion, according to Hitachi Zosen Inova, one of the partner companies.

When it is completed in 2024, the Dubai plant will be one of the largest in the world, capable of gobbling up 1.9 million tons of waste per year -- about 45 percent of the household waste currently produced in the emirate. - ‘People consume a lot’ - As the UAE has mushroomed from a desert outpost to a thriving business hub, waste has multiplied. So has power use, which has soared 750 percent since 1990 according to the International Energy Agency.

Now with about 10 million people, five times the population of 30 years ago, the wealthy UAE uses more electricity and creates more waste per head than almost any other country. Authorities put waste production at 1.8 kilos (four pounds) per person per day.

In the UAE, “people consume a lot, and they throw away a lot”, said Riad Bestani, founder of ECOsquare, a Dubai-based consultancy specializing in eco-friendly waste management. Landfills are strewn across the country.

In Dubai alone, six cover an area of about 1.6 million square meters (395 acres), according to the municipality. In the absence of other solutions, it estimates that landfills will occupy 5.8 million square meters of the emirate by 2041, an area the size of more than 800 football pitches.

Fees for landfills are “pretty much nonexistent, so it’s quite cheap and easy to dump all materials into the desert,” said Emma Barber, director of Dubai-based DGrade, which designs clothes and accessories from recycled plastic bottles.

The UAE has set about diversifying its electricity generation, more than 90 percent of which comes from gas-powered plants. Last year, the UAE inaugurated the Arab world’s first nuclear plant and, making use of its location in one of the world’s hottest regions, it has significant solar power resources.

In the run-up to the COP26 climate summit in Glasgow, which started on Sunday, the UAE said it was targeting carbon neutrality by 2050.

Read more:

Dubai to list DEWA as public company: Deputy ruler

Could the Gulf state of Oman hold the key to net zero emissions?

UAE and IRENA launch platform to accelerate renewable energy projects

Top Content Trending